Diversity Construction Group is building a better tomorrow for Connecticut and our region every day. We specialize in commercial construction — particularly renovations – for industrial facilities, educational facilities, houses of worship, office buildings and more. Call us at 203-699-8387 and we’d be happy to bid on your next project.

Southern Connecticut State University Brownell Hall Pipe

Project at a Glance
Southern Connecticut State University Brownell Hall Pipe Replacement
New Haven, CT

Client: Southern Connecticut State University
Architect/Engineer: Salamone & Associates, P.C.
Project Delivery: General Contractor

Diversity Construction Group was contracted for the replacement of two pipe hydronic mains above first floor ceiling as well as associated risers to and from the basement mechanical room utilizing Type L copper tubing, add shut off valves to allow further isolation of piping mains per building wing. Fire stopping, Remove and replace suspended ceiling. Remove and upgrade all lighting fixtures.
Work started Summer 2017 and was completed Summer 2017.

Community College Tutoring and Academic Success Center

Project at a Glance
Three Rivers Community College Tutoring and Academic Success Center
Norwich, CT

Client: Connecticut State Colleges and Universities
Architect/Engineer: Christopher Williams Architects
Project Delivery: General Contractor

Diversity Construction Group was contracted to perform alterations and the expansion of the existing First Floor Tutoring Center Tutoring adjacent to Library. Work included demolition of existing and the construction of new partitions, suspended ceilings and interior finishes, application of spray fireproofing and Second Floor structural steel framing between Tutoring Center and portion of Second Floor Library directly above, and incidental work at the adjacent Library and Second Floor.

Work began in April 2017 and was completed October 2017.
Reference Materials:

http://www.threerivers.edu/2017/11/01/three-rivers-celebrates-renovated-tutoring-academic-success-center-with-ribbon-cutting

http://cwarchitectsllc.com/three-rivers-tutoring-center

Aquatic Facility Renovation Beachland Park

Project at a Glance
Aquatic Facility Renovation Beachland Park
West Hartford, CT

Client: Town of West Hartford
Architect/Engineer: TLB Architecture, LLC – Mike Fortuna
Project Delivery: General Contractor

Diversity Construction Group was contracted for the removal of existing swimming pool. Replace current pools with a new swimming pool which includes a variety of water depths ranging from a zero depth “beach” type entry to five feet deep. Roadway and parking construction as well as site improvements

Video Link: https://youtu.be/_0iteulVpdQ

Work began in Fall 2014 and was completed Spring 2016

Rogers Park Middle School Danbury CT

Project at a Glance
Rogers Park Middle School Bathroom Upgrades
Danbury, CT

Client: Danbury Public Schools
Architect/Engineer: Friar Associates Inc.
General Contractor

Diversity Construction Group was contracted to upgrade of 6 bathrooms at
Rogers Park Middle School

Work started July 2016 and was completed September 2016.

 

UCONN Health Center – Office Renovation

Project at a Glance
UCONN Health – 10 Talcott Road, Farmington, CT
Farmington, CT

Client: UCONN Health

Architect/Engineer: UCONN Health

Project Delivery: General Contractor

Diversity Construction Group was contracted to perform office renovations to their Farmington location including HVAC balancing.

Work began in January 2017 and was completed in February 2017.

Norwich Technical HS – Biotechnical Lab

Project at a Glance
Norwich Technical HS – Biotechnology Laboratory Renovation
Norwich, CT

Client: State of Connecticut, Department of Administrative Services

Architect/Engineer: The S/L/A/M Collaborative

Project Delivery: General Contractor

Diversity Construction Group was contracted to convert an existing space to create their new Biotechnical Laboratory.  The space includes two Labs and one Prep Room equipped with state of the art lab tables, fume hood, emergency showers, and a -80 freezer.

Work began in October 2016 and was completed in March 2017.

CCSU Devils Den Renovation in Student Center

Project at a Glance
CCSU Devils Den Renovation in Student Center
New Britain, CT

Client: CCSU

Architect/Engineer: CCSU

Project Delivery: General Contractor

Diversity Construction Group was contracted to enhance their student center by creating a barrier between the seating area and food service area.

Work was completed in the summer of 2016.

Connecticut Mental Health Affiliates

Project at a Glance
Connecticut Mental Health Affiliates
New Britain, CT

Client: Connecticut Mental Health Affiliates

Architect/Engineer: Jacunski Humes Architects

Project Delivery: General Contractor

Diversity Construction Group was contracted to upgrade a patient facility.  The enhancements included new bathrooms, handicap showers and laundry facilities.  The project also included a new heating system and energy efficient LED lighting.  Work began in August 2016 and was completed in December 2016.

(FOG) at Ella T Grasso, Windham Technical, Oliver Wolcott and Bristol Technical High Schools

Project at a Glance
FOG Separators at Four Technical High Schools in CT

Client: State of Connecticut, Department of Administrative Services

Architect/Engineer: BVH Integrated Services for Ella Grasso & Windham; Fay, Spofford & Thorndike for Oliver Wolcott and Bristol Tech.

Project Delivery: General Contractor
Diversity Construction Group was contracted to install FOG separators at four different Technical High Schools.  The kitchens required significant underground demolition to create new grease lines separate from the existing sanitary lines

Work began in June of 2016 and was completed in August of 2016.

CCSU Copernicus Hall – Digital Printing & Graphics Technology Lab

Project at a Glance
CCSU – Copernicus Hall – Digital Printing & Graphics Technology Lab
New Britain, CT

Client: CCSU

Architect/Engineer: CCSU

Project Delivery: General Contractor
Diversity Construction Group was contracted to demolish an existing space at CCSU to create a new Digital Printing & Graphics Technology Lab for the College.

Work began in June 2016 and was completed in the August of 2016.

Simsbury Farms Ice Rink Shelter

Project at a Glance
Simsbury Farms Ice Rink Shelter
SImsbury, CT

Client: Town of Simsbury, CT

Architect/Engineer: Fletcher Thompson

Project Delivery: General Contractor
Diversity Construction Group was contracted to construct a spectator viewing area for their ice rink at Simsbury Farms.  The heated structure was constructed from cold formed metal framing and has tiered platforms for viewing.  The cedar shake siding on the outside matches the décor of the surrounding facility.

Work began in June 2016 and was completed in November 2016.

Quinebaug Valley Community College – Site Improvements

Project at a Glance
Quinebaug Valley CC – Site Improvements
Danielson, CT

Client: State of Connecticut, Department of Administrative Services

Architect/Engineer: Silver Petrucelli & Associates

Project Delivery: General Contractor
Diversity Construction Group was contracted to perform site improvements which included storm drainage improvements, a new entrance to the college, new parking lot paving and site lighting.

Work began in July 2016 and was completed in October 2016.

Waterbury Fire House #6

Project at a Glance
Waterbury Fire House #6
Manchester, CT

Client: Town of Waterbury, CT

Architect/Engineer: Weston & Sampson Inc.

Project Delivery: General Contractor
Diversity Construction Group was contracted to perform structural improvements to support a new locker room and bunk house for the Waterbury Firefighters of House #6.

Work began in March 2014 and was completed in September 2014.

UCONN Psychology Lab

Project at a Glance
UCONN Psychology Lab
West Hartford, CT

Client: UCONN Health, CT

Architect/Engineer: UCONN Health

Project Delivery: General Contractor
Diversity Construction Group was contracted to perform office renovations to their West Hartford Locations including HVAC balancing.

Work began in January 2016 and was completed in March 2016.

North Haven Fire House #3 & #4

Project at a Glance
North Haven Fire House #3 & #4
North Haven, CT

Client: Town of North Haven, CT

Architect/Engineer: Drumney Rosane Anderson, Inc

Project Delivery: General Contractor
Diversity Construction Group was contracted to convert existing fire station truck bays into community centers.

Work began in January 2016 and was completed in March 2016.

Cheshire HS Locker Rooms

Project at a Glance
Cheshire HS Locker Room Renovation
Cheshire, CT

Client: Town of CheshireArchitect/Engineer: BL Companies

Project Delivery: General Contractor
Diversity Construction Group was contracted to perform a complete demolition and rebuild of the boy’s football and soccer locker rooms. The work required new ADA access, showers, toilet rooms and changing areas.

Work began in May 2015 and was completed in August 2015.

Vinal Technical High School

Project at a Glance
Vinal Technical High School
Middletown, CT

Client: State of Connecticut – Department of Administrative Services

Architect/Engineer: Amenta/Emma Architects PC

Project Delivery: General Contractor
Diversity Construction Group was contracted to perform ADA Renovations to all the toilet rooms in the school.  All rooms were demolished with new underground plumbing and all new finishes.  In addition, the project also called for the installation of a new 3500 gallon fats, oils and grease separator.

Work began in April 2015 and was completed in September 2015.

Mohican Apartments

Project at a Glance
Mohican Apartments, New London, CT

Client: Related Management

Project Delivery: General Contractor
Diversity Construction Group was contracted by Related Management to replace their emergency generator.  The project required a roof opening to be established to allow for the generator to be lowered in to place with a crane.

Work was completed in the Fall of 2014.

oquam Magnet School – Gym and Cafeteria Floor Replacement

Project at a Glance
Toquam Magnet School
Stamford, CT

Client: Town of Stamford, CT

Architect/Engineer: Silver Petrucelli & Associates

Project Delivery: General Contractor
Diversity Construction Group was contracted to demolish the existing floors and sub floors, install new floors and finish floors.

Work began in June 2014 and was completed in August 2014

West Hartford Town Hall Service Area

Project at a Glance
West Hartford Service Area
West Hartford, CT

Client: Town of West Hartford, CT

Architect/Engineer: CR3, LLC

Project Delivery: General Contractor
Diversity Construction Group was contracted to perform service area modification for the Town of West Hartford.  The loading dock area was completely reconfigured to accommodate the use of trash compactors in lieu of open dumpsters.

Work began in May 2014 and was completed in October 2014.

Whiton Memorial Branch Library

Project at a Glance
Whiton Memorial Branch Library
Manchester, CT

Client: Town of Manchester, CT

Architect/Engineer: Amenta/Emma Architects PC

Project Delivery: General Contractor

Diversity Construction Group has won coveted contract to perform ADA Renovations to Whiton Memorial Branch Library. Upgrades will include the addition of a new elevator, installing a handicap ramp in the basement and renovating bathrooms.

DCG is excited to be partnering with the Town of Manchester on this project. Work completed in Summer 2014.

Solid Waste Division Office Building

Project at a Glance
Solid Waste Division Office Building
Stamford, CT

Client: City of Stamford, CT

Architect/Engineer: Salamone & Associates

Project Delivery: General Contractor

Diversity Construction Group is once again working with the City of Stamford. This time DCG has been selected to provide code compliance upgrades and building improvements to the solid Waste Division Office Building.

Renovations will include building new locker and shower rooms, building a new kitchenette and performing masonry repointing.

Renovations are scheduled to begin Summer 2014.

Town of Canterbury

Project at a Glance
Town of Canterbury
Canterbury, CT

Client: Town of Canterbury, CT

Architect/Engineer: CLA Engineers, Inc

Project Delivery: General Contractor

Diversity Construction Group, (DCG) has been selected to perform renovations to the Soccer and Baseball Fields at Robert Manship Park in Canterbury Connecticut.

Renovations to the baseball field will include earthwork, fencing (metal and wood), field equipment, dugouts, backstop and stone dust track.

Renovations to the soccer field will include earthwork, re-grading and repairing concrete drywalls, as well as wood fencing.

Repairs are scheduled to begin early spring and end early summer.

Hilton C. Buley Library, Southern Connecticut State University

Project at a Glance
Hilton C. Buley Library, Southern Connecticut State University
New Haven, CT

Client: Architect/Engineer:

Project Delivery: Sub-Contractor

Hilton C. Buley Library undergoes complete renovations. As a subcontractor, Diversity Construction Group will perform site concrete.

Renovation is scheduled to begin in March 2014 and end in August 2014.

Boyle Stadium

Project at a Glance
Boyle Stadium
Stamford, CT

Client: Jeff Brown, City of Stamford

Architect/Engineer: Bergmann Hendrie+Archetype, Inc.

Project Delivery: General Contractor

Diversity Construction was awarded coveted contract to renovate the 76 year-old historic Boyle Stadium. Plans for the stadium were first developed in 1933 during the depression and construction was completed in 1937.

Diversity Construction Group performed superior masonry restoration to the polygonal-cut, rock-faced granite walls, built new bathrooms, demolished old press-box, and re-built a new press-box on the west side of the stadium. DCG also added handicap ramps, performed miscellaneous site work and replaced doors and hardware. The project began in April 2013 and was completed in December 2013.

Caulkins Park

Project at a Glance
Caulkins Park
New London, CT

Client: Joe Johnson, City of New London

Architect: Barun Basu Associates

Project Delivery: General Contractor

Contract to perform extensive renovations to Caulkins Park was awarded to Diversity Construction. Work is underway to build three soccer fields that will accommodate youth programs, and a softball field to be used for high school level games and practices. Renovations will also include constructing a 5-foot wide, half-mile long track, that encircles the park and installing an underground irrigation system.

A portion of wetlands in the northwest corner of the park, near Riverview Avenue and Alger Street, will be reclaimed and transformed into two Bioswale Rain Gardens filled with native, noninvasive plants. Edges of the park, which are steeply sloped, will be landscaped with wildflowers.

Renovation began in May 2013 and is scheduled to be completed in May 2014.

Elmwood Community Center West Hartford, Connecticut

Project at a Glance
Elmwood Community Center
West Hartford, CT

Client: Town of West Hartford

Project Delivery: General Contractor

DCG was chosen to perform renovations to this multipurpose facility. Bathroom upgrade included plumbing, tile work and toilet partitions. DCG also upgraded the locker rooms as well, updating the shower, plumbing and installing ceramic tile.

The company installed acoustic ceiling, performed door hardware upgrades, and installed “Area of Refuge System” in the stairwell.

The renovations began on December 1, 2013 and were completed on January 1, 2014.

Capitol Region Education Council (CREC) Discovery Academy

Project at a Glance
Capitol Region Education Council (CREC) Discovery Academy
Hartford, CT

Client: John Mena, Capitol Region Education Council (CREC)

Project Delivery: General Contractor

In order to facilitate the growth of the Discovery Academy, CREC selected DCG to perform the renovation of this 5,000 square feet office space. During this project four classrooms and a cafeteria/gymnasium were created. Construction began in May 2013 and was completed in August 2013.

Hinsdale Elementary School

Project at a Glance
Hinsdale Elementary School
Winsted, CT

Client: Tom Denehey, Superintendent of Schools, Winsted Public School

Architect/Engineer: BL Companies

Project Delivery: General Contractor

As part of the 2011 to 2013 School Improvement Plan, Hinsdale Elementary School performed code renovation updates for over a 10,000 square feet area of its facility. As part of this project, Diversity Construction replaced fire doors and hardware within the corridors of the school. Construction began in February 2013 and was completed in October 2013.

Bethel Public Library

Project at a Glance
Bethel Public Library
Bethel, CT

Client: The Morganti Group, Inc.

Architect/Engineer: Anchor Engineering Services, Inc.

Project Delivery: Subcontractor

Built in 1909, the Bethel Public Library occupies approximately 13,000 square feet and serves the town of 17,000 residents. Diversity Construction Group provided Class 5 Finish to the interior of the library. A total of 9 colors were used to paint access walls, complimenting the beauty and architecture of this century old building.

Capitol Region Education Council (CREC) International Magnet School for Global Citizenship

Project at a Glance
Capitol Region Education Council (CREC) International Magnet School for Global Citizenship
South Windsor, CT

Client: John Mena, Capitol Region Education Council (CREC)

Project Delivery: Subcontractor

This 65,000-square-foot, $31.5M state-of-the-art facility is scheduled to be completed in January 2014. As a sub-contractor, Diversity Construction installed 160 interior doors and hardware to compliment the décor of the building.

Capitol Region Education Council (CREC) Reggio Magnet School of the Arts

Project At a Glance
Capitol Region Education Council (CREC) Reggio Magnet School of the Arts
Avon, CT

Client: John Mena, Capitol Region Education Council (CREC)

Projet Delivery: Subcontractor

The stunning, 63,000 square foot building has been under construction since the summer of 2012 and is scheduled to be completed in January 2014. As a sub-contractor, Diversity construction installed over 200 visual display boards and bathroom partitions and accessories for this project.

Elms Common

Project at a Glance
Elms Common
Rocky Hill, CT

Client: PDS Engineering & Construction, Inc.

Project Delivery: Subcontractor

Tucked in a quiet residential area on Elms Common Drive, Elms Common is comprised of 156 large studio, one and two bedroom apartments in three four-story buildings with elevators for convenience and comfort. The complex boasts fitness facilities and outdoor pools.

Diversity construction was selected to remove carports in preparation for the installation of new carports for this apartment complex. DCG also upgraded the electrical service to the carports as well.

CREC Office Fitout

Project at a Glance
CREC Office Fitout
Hartford, CT

Client: John Mena

Project Delivery: General Contractor

Diversity Construction Group was chosen as the General Contractor to renovate the basement of the Construction Division Building. Diversity Construction performed electrical and HVAC upgrades, converted unused area into office space and constructed 2 conference rooms, one serving as multi-media for training and presentations.. Construction began in July 2012 and was completed in September 2012.

Capitol Region Education Council (CREC) International Magnet School

Project at a Glance
Capitol Region Education Council (CREC) International Magnet School
East Hartford, CT

Client: John Mena, Capitol Region Education Council (CREC)

Project Delivery: General Contractor

A complete renovation of the main office was performed. Work included selective demolition, installation of new interior partition walls, doors and hardware, flooring, paint, acoustical ceilings, electrical, fire protection and HVAC.

The renovations began in July 2012and were completed in August 2012.

Extension of Air Line State Park Trail

Project at a Glance
Extension of Air Line State Park Trail
East Hampton, CT

Client: Ruth Plumber, Town of East Hampton

Engineer: Anchor Engineering Service, Inc.

Project Delivery: General Contractor

The Airline Trail in East Hampton is a section of the 50-mile Air Line State Park Trail that begins in East Hampton and ends in Putnam. Air Line State Park Trail environment is diverse with forest, streams and wetlands and is popular for experience the changing leaves in the Fall. It has over one dozen bridges and stone culverts and two large viaducts called the Lyman and The Colchester which are listed in the National Register of Historic Places.

In 2012 The Town of East Hampton received a grant to pursue the extension of the Air Line State Park Trail and selected Diversity Construction Group as the general contractor. The trail project, designed by Anchor Engineering, begins at Main Street and extends over the Pocotopaug Creek, across Watrous Street and eventually connects with the exiting trail.

The project incorporates more than 1,500 square feet of modular block retaining wall to support the switch backs as well as the bridge on the Pocolopay River. The project began in February 2012 and was completed in August 2012.

Pine Street Trading's Distribution Facility Loading Dock

Project at a Glance:
Pine Street Trading Company
Southington, Connecticut

Client: PDS Engineering & Construction, Inc.

Project Delivery: Subcontractor

Pine Street Trading Company is New England’s leader in the marketing and distribution of convenience and beverage products. To meet their expanding distribution operation, substantial modifications to the loading dock was performed. This included expanding the loading area by adding an additional bay, enclosing the existing dock with masonry and installing new overhead doors, dock levelers and seals at five locations. The project began in November 2011and was completed in March 2012.